ACT WorkKeys Graphic Literacy

38 questions/tasks. Use the approved directions below.

Original practice booklet. Record responses here or on paper, then reveal each answer for review. This viewer does not calculate an exam score. Responses are saved locally when browser storage is available, not submitted for assessment. Export or copy your notes before closing if storage is unavailable, and before clearing browser data.

Directions and supporting materials
Jump to a question

Question 1

G01: Crates received by loading dock0246810ABCD
According to Graphic G01, how many crates did Dock B receive?
  • ☐ A. 7 crates
  • ☐ B. 6 crates
  • ☐ C. 4 crates
  • ☐ D. 9 crates
Show answer and explanation

Response: D

Final answer: 9 crates
Dock B's bar ends halfway between the grid lines marked 8 and 10, so read its height against that interval rather than using the count for a neighboring dock. B received 9 crates.

Question 2

G02: Supply receiving sequenceScan labelInspect itemRecordconditionShelve item
In Graphic G02, which step follows inspecting the item?
  • ☐ A. Repeat the inspection.
  • ☐ B. Record its condition.
  • ☐ C. Shelve the item.
  • ☐ D. Scan its label.
Show answer and explanation

Response: B

Final answer: Record its condition.
The next step is recording. Follow the arrow out of Inspect item to Record condition, then continue to Shelve item only after that intervening step. Scanning lies before inspection, and the diagram has no arrow that sends the item back for another inspection.

Question 3

G03: Workshop floor planSupply roomWorkshopOfficeBreak roomN
Which room occupies the northeast corner of Graphic G03?
  • ☐ A. The break room.
  • ☐ B. The office.
  • ☐ C. The workshop.
  • ☐ D. The supply room.
Show answer and explanation

Response: C

Final answer: The workshop.
North points upward on this plan. Moving toward the top and then to the right locates the room labeled Workshop, whereas the break room sits below it and the supply room is across the dividing wall. The workshop is northeast.

Question 4

G04: Staff availability
StaffQualificationMonTueWedThu
AriLiftAM--AMPM
BeaFrontAMAMPM--
CyLift--PMAMPM
DeeFrontPM----AM
AM = available 8 a.m.--noon; PM = available noon--4 p.m.; -- = unavailable.
Using Graphic G04, when is Cy available on Thursday?
  • ☐ A. For both listed shifts.
  • ☐ B. From 8 a.m. to noon.
  • ☐ C. Cy is unavailable that day.
  • ☐ D. From noon to 4 p.m.
Show answer and explanation

Response: D

Final answer: From noon to 4 p.m.
Cy's Thursday entry is PM. Use the shift legend to turn that code into an interval: noon to 4 in the afternoon. The AM entry elsewhere in Cy's row belongs to Wednesday, so it cannot establish Thursday morning availability.

Question 5

Which staff member in Graphic G04 is available from 8 a.m. to noon on both Monday and Wednesday?
  • ☐ A. Dee.
  • ☐ B. Bea.
  • ☐ C. Ari.
  • ☐ D. Cy.
Show answer and explanation

Response: C

Final answer: Ari.
Compare Monday with Wednesday within each person's row, keeping both columns in view so a morning entry on one day does not mask an afternoon entry on the other. Ari has both AM entries. Bea's Wednesday is PM, Cy is unavailable Monday, and Dee has no Wednesday shift.

Question 6

G05: Open service slotsOpen slots0246810MonTueWedThuTeam ATeam BDay
Which statement describes both patterns in Graphic G05?
  • ☐ A. A falls through Wednesday and then falls again; B rises through Wednesday and then rises again.
  • ☐ B. A rises through Wednesday and then falls; B falls through Wednesday and then rises.
  • ☐ C. A falls through Wednesday and then rises; B rises through Wednesday and then falls.
  • ☐ D. A rises through Wednesday and then rises again; B falls through Wednesday and then falls again.
Show answer and explanation

Response: B

Final answer: A rises through Wednesday and then falls; B falls through Wednesday and then rises.
Wednesday is the turning point. Team A climbs through the values 2, 5, and 6 before falling to 4 on Thursday. Team B's first three values fall from 8 through 6 to 4, but its last value rises to 7, so the correct statement must include both reversals.

Question 7

A coordinator needs at least 6 open slots with Team A and at least 4 with Team B on the same day. Which day in Graphic G05 meets both needs?
  • ☐ A. Tuesday.
  • ☐ B. Thursday.
  • ☐ C. Monday.
  • ☐ D. Wednesday.
Show answer and explanation

Response: D

Final answer: Wednesday.
Both minimums are inclusive, which means Wednesday's 6 A slots and 4 B slots satisfy the coordinator's requirements even though neither count exceeds its threshold. Wednesday works. All three other days fail the A minimum, with counts of 2 on Monday, 5 on Tuesday, and 4 on Thursday.

Question 8

G06: Pickup locationsR1: North (N)R2: East (E)R3: South (S)
Pickup codeScheduled bins
N6
E8
S4
Which pickup plan below accurately represents the scheduled bins at all three rooms in Graphic G06?
Plan 1R1: 6 binsR2: 8 binsR3: 4 binsPlan 2R1: 8 binsR2: 6 binsR3: 4 binsPlan 3R1: 6 binsR2: 4 binsR3: 8 binsPlan 4R1: 4 binsR2: 8 binsR3: 6 bins
  • ☐ A. Plan 2.
  • ☐ B. Plan 3.
  • ☐ C. Plan 1.
  • ☐ D. Plan 4.
Show answer and explanation

Response: C

Final answer: Plan 1.
Keep each code attached to its count while moving from the table to the floor plan. N has 6 bins in R1, E has 8 in R2, and S has 4 in R3, so Plan 1 preserves all three pairings. The other plans exchange two counts.

Question 9

A driver starts at the pickup code with the most scheduled bins in Graphic G06. Which room should the driver visit first?
  • ☐ A. Room R2.
  • ☐ B. Rooms R1 and R3 tie.
  • ☐ C. Room R3.
  • ☐ D. Room R1.
Show answer and explanation

Response: A

Final answer: Room R2.
Start with the largest bin count. The table's 8 belongs to E, and following that same code onto the floor plan leads to Room R2, rather than either room associated with the smaller counts of 6 and 4. R2 is the first stop.

Question 10

G07: Results of ten checks per cell024681082Cell A64Cell B91Cell C73Cell DLight: readyDark: reworkCounts above bars:rework
Which cell in Graphic G07 has the most ready items and the fewest rework items?
  • ☐ A. Cell C.
  • ☐ B. Cell B.
  • ☐ C. Cell A.
  • ☐ D. Cell D.
Show answer and explanation

Response: A

Final answer: Cell C.
Cell C has 9 ready items. Its remaining item requires rework, giving C both the largest ready count and the smallest rework count among the four equally sized bars. The other cells have 8, 6, or 7 ready items and correspondingly larger rework sections.

Question 11

A supervisor chooses Cell B for additional rework training. Which explanation is best supported by Graphic G07?
  • ☐ A. B has the fewest rework items among equally sized groups.
  • ☐ B. B has the most rework among equally sized groups.
  • ☐ C. B has fewer total checks than every other cell.
  • ☐ D. B has the most ready items among equally sized groups.
Show answer and explanation

Response: B

Final answer: B has the most rework among equally sized groups.
All four groups contain ten checks, so B's 4 rework items can be compared fairly with the 2, 1, and 3 rework items in the other cells. B has the greatest rework count. That supports the supervisor's training priority, although these results alone do not identify why rework occurred.

Question 12

G08: Open inspection issues
RegionUnitAreaMonTue
EastE1Dock43
EastE1Store65
EastE2Dock64
EastE2Store57
WestW1Dock32
WestW1Store21
WestW2Dock86
WestW2Store44
Ticket PE1 / DockTicket RE2 / StoreTicket TW2 / Dock
How many open issues does Graphic G08 list for the W1 Store area on Tuesday?
  • ☐ A. 3 issues
  • ☐ B. 4 issues
  • ☐ C. 1 issue
  • ☐ D. 2 issues
Show answer and explanation

Response: C

Final answer: 1 issue
Use the Store row under W1. Reading across to Tuesday gives 1 issue, while the 2 immediately to its left belongs to Monday and the nearby Dock row describes a different area. The requested count is 1.

Question 13

Ticket R in Graphic G08 needs its Tuesday issue count entered in a report. Which count belongs to that ticket?
  • ☐ A. 4 issues
  • ☐ B. 6 issues
  • ☐ C. 3 issues
  • ☐ D. 7 issues
Show answer and explanation

Response: D

Final answer: 7 issues
Ticket R identifies E2 / Store. Carry both parts of that location into the inspection table, then read its Tuesday column to get 7 issues. A lookup using E2 alone could land on Dock instead, and taking the Monday value would also miss the requested count.

Question 14

For which area does Graphic G08 show fewer open issues on Tuesday than Monday at every unit?
  • ☐ A. Dock areas.
  • ☐ B. Store areas.
  • ☐ C. Both areas at every unit.
  • ☐ D. Neither area at any unit.
Show answer and explanation

Response: A

Final answer: Dock areas.
Each Dock row decreases from Monday to Tuesday, with the four pairs reading 4 to 3, 6 to 4, 3 to 2, and 8 to 6. Dock areas meet the condition. Stores do not, since E2 rises from 5 to 7 and W2 remains at 4 on both days.

Question 15

G09: Technician assignments08:0009:0010:0011:0012:00AdaBenCalDiaEliFayShaded = assigned; blank = available.
TeamWorkerTradeLift certified
NorthAdaEYes
NorthBenPYes
CentralCalPNo
CentralDiaENo
SouthEliEYes
SouthFayPYes
E = electrical; P = plumbing. A task needs availability for its entire interval.
Which pair in Graphic G09 is available for the entire 10:00 a.m.-to-noon interval?
  • ☐ A. Cal and Dia.
  • ☐ B. Eli and Fay.
  • ☐ C. Ada and Dia.
  • ☐ D. Ada and Ben.
Show answer and explanation

Response: C

Final answer: Ada and Dia.
Blank space represents availability. Ada's assignment ends at 10 and Dia's at 9, leaving both rows blank for the entire interval from 10 to noon. Cal remains busy until 11. Ben begins at 10, and Eli and Fay are already assigned through noon, ruling out the other pairs.

Question 16

A lift inspection must run from 10:00 a.m. to noon. According to Graphic G09, which worker is both available throughout and lift certified?
  • ☐ A. Ada.
  • ☐ B. Dia.
  • ☐ C. Ben.
  • ☐ D. Fay.
Show answer and explanation

Response: A

Final answer: Ada.
Check availability before lift certification, because a Yes in the qualification table is insufficient if the worker is already assigned during the inspection. Ada meets both conditions. Dia is free for the interval but lacks certification, while the certified Ben and Fay have assignments that overlap it.

Question 17

A plumbing task requires a worker from 8:00 to 10:00 a.m. Which worker in Graphic G09 can take the entire task?
  • ☐ A. Fay.
  • ☐ B. Ben.
  • ☐ C. Cal.
  • ☐ D. Dia.
Show answer and explanation

Response: B

Final answer: Ben.
The trade legend makes P plumbing, so compare Ben, Cal, and Fay against the entire interval from 8 to 10 before considering their availability for just part of that time. Ben can cover it. His assignment begins at 10, whereas Cal and Fay become busy at 9 and Dia has trade E.

Question 18

G10: Return-routing processRead return labelBarcodereadable?Manual checkItem damaged?QuarantineLarge item?Resale AResale BNoYesYesNoNoYes
TicketReadableDamagedSize
T1YesNoSmall
T2NoNoLarge
T3YesNoLarge
T4YesYesLarge
OutcomeLocationWeekly count
Manual checkM13
QuarantineQ26
Resale AA19
Resale BB14
Using Graphic G10, which location receives Ticket T4?
  • ☐ A. B1.
  • ☐ B. Q2.
  • ☐ C. A1.
  • ☐ D. M1.
Show answer and explanation

Response: B

Final answer: Q2.
T4 passes the readable-barcode decision. Its Yes at Item damaged then sends it directly to Quarantine, where the outcome table supplies location Q2. The large-item decision lies farther down the No-damage branch, so using T4's size to choose a resale location would skip the route it actually follows.

Question 19

Which outcome relationship appears in Graphic G10's weekly counts?
  • ☐ A. Resale A exceeds Quarantine, which exceeds Manual check.
  • ☐ B. Quarantine exceeds Resale A, which exceeds Manual check.
  • ☐ C. Resale A and Quarantine have equal counts.
  • ☐ D. Manual check exceeds Quarantine, which exceeds Resale A.
Show answer and explanation

Response: A

Final answer: Resale A exceeds Quarantine, which exceeds Manual check.
Read the weekly counts beside the outcomes, rather than the ticket conditions or their location codes, to compare Resale A at 9 with Quarantine at 6 and Manual check at 3. The counts descend in that order.

Question 20

A clerk sends a new small, undamaged item with an unreadable barcode to A1. Which correction follows Graphic G10?
  • ☐ A. Send it to Q2 because every unreadable barcode follows the Damaged branch.
  • ☐ B. Send it to M1 because the barcode branch ends at Manual check before size is considered.
  • ☐ C. Keep it at A1 because being small and undamaged is sufficient for Resale A.
  • ☐ D. Send it to B1 because the barcode branch assigns unreadable items to Resale B.
Show answer and explanation

Response: B

Final answer: Send it to M1 because the barcode branch ends at Manual check before size is considered.
The unreadable barcode determines the branch. Its No arrow leads straight to Manual check and location M1, without reaching either the damage decision or the later size decision. Being small and undamaged therefore cannot justify the clerk's choice of A1, which is reached through a different path.

Question 21

G15: Maintenance ordersOrders0246810MonTueWedThuPlannedUnplannedDay
Ticket codeCategoryCrew
PAPlannedA
UBUnplannedB
PCPlannedC
CrewAreaAvailable shift
ANorthAM
BCentralPM
CSouthAM
Which area is assigned to Ticket UB in Graphic G15?
  • ☐ A. All three areas.
  • ☐ B. North.
  • ☐ C. South.
  • ☐ D. Central.
Show answer and explanation

Response: D

Final answer: Central.
UB is assigned to Crew B. Look up that crew in the separate assignment table to find Central, carrying the crew letter across rather than using the ticket category to guess an area. Crews A and C serve North and South respectively.

Question 22

Which relationship does Graphic G15 show over the four days?
  • ☐ A. Planned orders exceed unplanned orders except on Wednesday, when they are equal.
  • ☐ B. Unplanned orders exceed planned orders except on Wednesday, when they are equal.
  • ☐ C. Unplanned orders exceed planned orders except on Thursday, when they are equal.
  • ☐ D. Planned orders exceed unplanned orders except on Tuesday, when they are equal.
Show answer and explanation

Response: A

Final answer: Planned orders exceed unplanned orders except on Wednesday, when they are equal.
Wednesday's two points both show 4. On Monday the planned count is 4 against 3 unplanned, Tuesday shows 6 against 2, and Thursday shows 5 against 3, establishing that planned orders are higher on every other day. The equality belongs to Wednesday, not Tuesday or Thursday.

Question 23

A backup crew can cover a day only when unplanned orders are no more than 2 and planned orders are at least 4. Which of Tuesday, Wednesday, and Thursday qualifies in Graphic G15?
  • ☐ A. No day qualifies.
  • ☐ B. Tuesday.
  • ☐ C. Wednesday.
  • ☐ D. Thursday.
Show answer and explanation

Response: B

Final answer: Tuesday.
Among the three days named in the question, Tuesday has 2 unplanned orders and 6 planned orders, meeting the maximum of 2 and the minimum of 4 at the same time. Tuesday qualifies. Wednesday and Thursday have 4 and 3 unplanned orders respectively, which rules them out even though their planned counts suffice.

Question 24

G11: Depot road networkRSTUVDL1L2L3L7L4L5L6L8
RouteRoad pairMax sizeClearanceWindowStateFrozen
AL1 / L4LargeHighEarlyOpenYes
BL2 / L5LargeHighLateClosedYes
CL3 / L6LargeLowEarlyOpenYes
DL7 / L8LargeHighLateOpenNo
VehicleSizeHeightCargoAssigned route
V1SmallLowDryA
V2LargeLowDryD
V3SmallLowDryC
V4LargeHighFrozen--
V5SmallHighDryB
V6LargeLowFrozenA
Early = arrival by noon; Late = afternoon. High vehicles need High clearance. Small vehicles fit either size limit. Frozen cargo requires Yes. Dispatch ticket: V4; arrival required by noon.
In Graphic G11, Vehicle V3 follows its assigned route. Which road links that route's intermediate junction to D?
  • ☐ A. L4.
  • ☐ B. L5.
  • ☐ C. L8.
  • ☐ D. L6.
Show answer and explanation

Response: D

Final answer: L6.
V3 is assigned to Route C. That route's road pair takes it from R through U to D, and the network labels the final road from U to D as L6. L4, L5, and L8 approach D from other junctions, so none completes V3's assigned path.

Question 25

Which arrival-window relationship holds between the assigned vehicles whose routes pass through S and those whose routes pass through V in Graphic G11?
  • ☐ A. V1 has an earlier window than both V2 and V6.
  • ☐ B. V1, V2, and V6 all have the same window.
  • ☐ C. V2 has an earlier window than both V1 and V6.
  • ☐ D. V1 and V6 have earlier windows than V2.
Show answer and explanation

Response: D

Final answer: V1 and V6 have earlier windows than V2.
The network places S on Route A and V on Route D, allowing the route codes to connect the junctions in the question with the vehicle assignments. A carries V1 and V6. Its window is Early, while D's assigned V2 has a Late window, so both A vehicles arrive in the earlier window.

Question 26

Which route can meet the dispatch ticket in Graphic G11 while satisfying all listed vehicle and cargo restrictions?
  • ☐ A. Route C.
  • ☐ B. Route B.
  • ☐ C. Route A.
  • ☐ D. Route D.
Show answer and explanation

Response: C

Final answer: Route A.
Route A satisfies the complete ticket. V4 is Large and High with Frozen cargo, and A is open with the matching size, clearance, cargo permission, and Early window needed for arrival by noon. C's Low clearance cannot accommodate V4. B is closed with a Late window, while D also has a Late window and lacks permission for frozen cargo.

Question 27

G12: Circulation pressure dashboard
UnitChannelC1C2C3C4C5C6
SupplyS2141615181719
SupplyS4201820182018
SupplyS1161617161716
SupplyS3151716171617
RecoveryR3161718192021
RecoveryR1232221201918
RecoveryR4171917191719
RecoveryR2212022192120
C1--C6 are consecutive cycles. All readings are in psi. Sensor-to-channel key (columns name sensors)
UnitABCD
SupplyS2S4S1S3
RecoveryR3R1R4R2
UnitC1C2C3C4C5C6
SupplyM1M2M1M2M1M2
RecoveryM1M1M2M1M1M2
UnitSensorM1 permitted psiM2 permitted psi
SupplyA14--1915--20
SupplyB18--2218--21
SupplyC15--1816--19
SupplyD15--1816--19
RecoveryA16--2218--21
RecoveryB18--2318--21
RecoveryC16--1817--20
RecoveryD19--2218--21
The mode sequence for each unit repeats. Permitted ranges include both endpoints. A reading outside its unit, sensor, and current-mode range requires review.
At Cycle 5 in Graphic G12, how does A compare with B within each unit?
  • ☐ A. A is above B in Supply and below B in Recovery.
  • ☐ B. A is above B in both Supply and Recovery.
  • ☐ C. A is below B in Supply and above B in Recovery.
  • ☐ D. A is below B in both Supply and Recovery.
Show answer and explanation

Response: C

Final answer: A is below B in Supply and above B in Recovery.
In Supply, A maps to S2 and B to S4, giving Cycle 5 readings of 17 and 20, so A is below B there. Recovery uses a different mapping. Its A is R3 at 20 and its B is R1 at 19, which reverses the comparison and puts A above B.

Question 28

Which Recovery sensor requires review at Cycle 2 in Graphic G12?
  • ☐ A. Sensor D.
  • ☐ B. Sensor A.
  • ☐ C. Sensor B.
  • ☐ D. Sensor C.
Show answer and explanation

Response: D

Final answer: Sensor C.
Recovery is in M1 at Cycle 2. The channel key gives sensor readings of 17 for A, 22 for B, 19 for C, and 20 for D, which must each be checked against that sensor's Recovery M1 range. C exceeds its limit of 18. The other three readings fall within their own inclusive limits of 16 through 22, 18 through 23, and 19 through 22 respectively.

Question 29

Suppose Recovery A and B continue their steady one-psi trends for one more cycle. With the mode sequence in Graphic G12 repeating, which statement describes their review status at Cycle 7?
  • ☐ A. A remains permitted, while B requires review.
  • ☐ B. Both A and B require review.
  • ☐ C. Both A and B remain permitted.
  • ☐ D. B remains permitted, while A requires review.
Show answer and explanation

Response: A

Final answer: A remains permitted, while B requires review.
Follow Recovery's R3 and R1 rows for A and B, then extend the stated one-psi trends to get A at 22 and B at 17 in Cycle 7. The repeating mode returns to M1. A's M1 range includes its upper endpoint of 22, but B's minimum is 18, so B alone requires review under the assumed continuation.

Question 30

G13: Stores and release orders
StoreCodeItemReadyTargetRelease
NorthPKit56AM
NorthQCable34PM
NorthRSeal76AM
SouthPKit43AM
SouthQCable65AM
SouthRSeal23PM
OrderStoreCodeNeededPickup
K1NorthQ4AM
K2SouthP5AM
K3NorthP4AM
K4SouthR3AM
K5NorthR8AM
Ready quantities exclude damaged and reserved items. An order can be released only if Ready meets Needed and Release matches Pickup. Target is the desired stock quantity for that store and product; Needed is the quantity on a particular order.
Which order in Graphic G13 can be released for its stated pickup?
  • ☐ A. K2.
  • ☐ B. K1.
  • ☐ C. K3.
  • ☐ D. K4.
Show answer and explanation

Response: C

Final answer: K3.
K3 links to North's P stock. Its order needs 4 units, the stock row has 5 Ready, and the AM release matches the order's AM pickup, satisfying both conditions for release. K1 lacks the quantity and AM release. K2 is also short, while K4 lacks enough Ready stock and has a PM release for its AM pickup.

Question 31

Which graph below accurately shows the current Ready stock for the product and store listed on each of Orders K1, K2, and K3 in Graphic G13?
Each bar shows the current Ready stock for the store and product on the labeled order. Vertical scales are in units. Graph 102468K1K2K3Graph 202468K1K2K3Graph 302468K1K2K3Graph 402468K1K2K3
  • ☐ A. Graph 4.
  • ☐ B. Graph 2.
  • ☐ C. Graph 3.
  • ☐ D. Graph 1.
Show answer and explanation

Response: D

Final answer: Graph 1.
Orders K1, K2, and K3 identify North Q, South P, and North P respectively, whose separate stock rows give Ready quantities of 3, 4, and 5. Graph 1 preserves those pairings. Each other graph swaps two of those quantities, so having the same three bar heights is insufficient unless each height stays above the correct order label.

Question 32

An AM pickup order at North needs more units than are Ready, while South already exceeds its Target for the same product. Which proposed display focuses on that comparison in Graphic G13?
  • ☐ A. Paired Ready and requirement bars for Q: North's order quantity beside South's Target.
  • ☐ B. Paired Ready and requirement bars for P: North's order quantity beside South's Target.
  • ☐ C. Paired Ready and requirement bars for each store, combining all its products and orders.
  • ☐ D. Paired Ready and requirement bars for R: North's order quantity beside South's Target.
Show answer and explanation

Response: A

Final answer: Paired Ready and requirement bars for Q: North's order quantity beside South's Target.
North's order for Q needs 4. Only 3 are Ready there, while South has 6 Q units against a Target of 5, so paired Q bars can show the North order shortage alongside the South stock surplus. North can fill its P order. R is short at North but also below Target at South, and combining products would conceal which product meets both conditions.

Question 33

G16: Training dashboard
DepartmentCourseEnrolledWaitlist
FinanceA52
FinanceB30
FinanceC41
StoresA60
StoresB42
StoresC21
ServiceA31
ServiceB50
ServiceC62
SafetyA40
SafetyB21
SafetyC51
Certificate XCourses A and BCertificate YCourses C and D
CourseShiftOpen seats
AAM3
BAM2
CAM0
DAM4
RegionCourseW1W2W3W4W5W6
EastA645576
EastB354354
EastC243557
WestA465545
WestB756656
WestC546546
RegionCourseWeekly goal
EastA6
EastB4
EastC6
WestA5
WestB6
WestC7
AM = morning; PM = afternoon. Certificates authorize only the listed courses. A course needs an open seat for a new enrollee. Existing enrollments are retained. Additional enrollment from a department is allowed only while its Enrolled count for that course is below 5. A course absent from the enrollment table accepts no new department enrollments. Waitlist requests await eligibility checks and do not reserve the listed seats. Completion goals apply to each region and course separately.
Among the courses authorized by Certificate Y in Graphic G16, only one appears in the enrollment table. How many Finance employees are enrolled in that course?
  • ☐ A. 3 employees
  • ☐ B. 4 employees
  • ☐ C. 2 employees
  • ☐ D. 5 employees
Show answer and explanation

Response: B

Final answer: 4 employees
Y authorizes Courses C and D. Only C appears in the enrollment table, so use Finance's C row and its Enrolled column to find 4 employees. The adjacent 1 is a waitlist count, which represents pending employees rather than employees already enrolled in the course.

Question 34

A new Finance employee holds only Certificate X and can attend only in the morning. Which course in Graphic G16 can accept this employee under all displayed conditions?
  • ☐ A. Course B.
  • ☐ B. Course A.
  • ☐ C. Course C.
  • ☐ D. Course D.
Show answer and explanation

Response: A

Final answer: Course B.
X limits this employee to A or B, but Finance already has 5 people enrolled in A and cannot add another under the department cap despite the available morning seats. Finance has capacity for B. Its Finance enrollment is 3 and its morning session has 2 open seats, so B satisfies eligibility, department capacity, and attendance conditions together.

Question 35

For the course authorized by Y that has current department enrollments, which statement compares its Week 1-to-Week 6 patterns and regional goals in Graphic G16?
  • ☐ A. East stays above West throughout the period, but only East meets its Week 6 goal.
  • ☐ B. East closes the initial gap and finishes above West, but only East meets its Week 6 goal.
  • ☐ C. West keeps its initial lead and finishes above East, and both regions meet their Week 6 goals.
  • ☐ D. East closes the initial gap and finishes above West, and both regions meet their Week 6 goals.
Show answer and explanation

Response: B

Final answer: East closes the initial gap and finishes above West, but only East meets its Week 6 goal.
Certificate Y identifies C and D, and the enrollment records restrict the comparison to C, whose East count starts at 2 against West's 5 and ends at 7 against West's 6. East finishes ahead. The equal counts in Weeks 2 and 4 show intermediate ties, while the separate Week 6 goals of 6 for East and 7 for West mean only East reaches its goal.

Question 36

G14: Service-center dashboard
TeamTicket typeOldest age (days)ImpactState
AlderNetwork2CriticalOpen
AlderAccess3RoutineOpen
AlderHardware8RoutineOpen
BirchNetwork4CriticalOpen
BirchAccess1RoutineOpen
BirchHardware5RoutineOpen
CedarNetwork3CriticalClosed
CedarAccess5RoutineOpen
CedarHardware8RoutineOpen
DogwoodNetwork2CriticalOpen
DogwoodAccess5RoutineOpen
DogwoodHardware8RoutineClosed
Ticket typeMaximum age (days)
Network3
Access4
Hardware7
A ticket is overdue when its age exceeds the maximum for its type. Dispatch rule: attend first to an Open, Critical, overdue ticket. Closed tickets do not enter the dispatch queue.
TeamTicket typeW1W2W3
AlderNetwork210
AlderAccess100
AlderHardware021
BirchNetwork012
BirchAccess210
BirchHardware110
CedarNetwork110
CedarAccess021
CedarHardware321
DogwoodNetwork010
DogwoodAccess321
DogwoodHardware200
The weekly matrix counts all Open overdue tickets, by team and type, at three snapshots. The first matrix describes the oldest ticket of each type per team at W3. Impact classification stays the same across these weeks.
TeamCritical overdueRoutine overdue
Alder01
Birch20
Cedar02
Dogwood01
The final table groups all W3 Open overdue tickets by impact, rather than counting only the oldest examples.
Which relationship holds for Open overdue tickets classified Critical at Alder and Birch over the three weeks in Graphic G14?
  • ☐ A. Alder and Birch both increase each week.
  • ☐ B. Birch decreases each week, while Alder increases each week.
  • ☐ C. Alder decreases each week, while Birch increases each week.
  • ☐ D. Alder and Birch both decrease each week.
Show answer and explanation

Response: C

Final answer: Alder decreases each week, while Birch increases each week.
Critical corresponds to Network in the case matrix, so use those rows in the separate weekly table rather than combining them with Routine Hardware or Access tickets. Alder falls from 2 to 0. Its middle count is 1, while Birch's 0, 1, and 2 rise at each successive week, establishing the opposite trends.

Question 37

A dispatcher selects Birch's Network ticket before the other oldest tickets in Graphic G14. Which reason best applies the displayed dispatch rule?
  • ☐ A. It is open and critical, and its 4-day age exceeds the Network maximum of 3.
  • ☐ B. Its 4-day Network age is within the Hardware maximum of 7, so it should be served first.
  • ☐ C. Its 5-day Hardware age exceeds the Network maximum of 3, so Hardware has priority.
  • ☐ D. Older routine tickets should take priority over Birch because their ages are greater.
Show answer and explanation

Response: A

Final answer: It is open and critical, and its 4-day age exceeds the Network maximum of 3.
Birch's Network ticket satisfies the first-priority rule through its Open state, Critical classification, and age of 4, which exceeds the Network maximum of 3. All three conditions matter. Other Critical records are within that limit or closed, and greater ages on Routine tickets cannot replace the classification required by the rule.

Question 38

A supervisor wants an age-versus-limit graphic comparing the oldest Open overdue ticket shown for Birch with the oldest Open overdue ticket shown for Cedar. Which proposed display and reason best explain the dispatch priority in Graphic G14?
  • ☐ A. Age and type-limit bars for Birch Network and Cedar Network: both are Open and overdue, and both are Critical.
  • ☐ B. Age and type-limit bars for Birch Network and Cedar Hardware: both are overdue, but only the Birch ticket is Critical.
  • ☐ C. Age and type-limit bars for Birch Network and Cedar Access: both are overdue, and each is its team's oldest eligible ticket.
  • ☐ D. Age and type-limit bars for Birch Hardware and Cedar Hardware: both are overdue, and the Birch ticket is Critical.
Show answer and explanation

Response: B

Final answer: Age and type-limit bars for Birch Network and Cedar Hardware: both are overdue, but only the Birch ticket is Critical.
First qualify the tickets using Open state and their own type limits, then compare ages within each team rather than simply choosing the largest age in the matrix. Birch's Network ticket is overdue at 4 against 3, and Cedar's Hardware ticket is overdue at 8 against 7. Cedar also has overdue Access at 5. Hardware is its older eligible record, so age-and-limit bars for Birch Network and Cedar Hardware preserve both the requested selection and the reason the younger Critical ticket has priority over the older Routine ticket.